Project: Midfield Terminal - Abu Dhabi Airport
Midfield Terminal - Abu Dhabi Airport is another Alpin aerospace BIM, LEED and Commissioning project at Abu Dhabi, United Arab Emirates
Upon completion, the piers will accommodate up to 65 aircrafts; check-in will be capable of handling around 8,500 passengers per hour; with a baggage system that can process over 19,000 bags per hour.
With a total build-up area of 700,000sqm, the ‘X’-shaped Abu Dhabi Midfield Terminal is comprised of a 6-floor-central processor and 4 piers.
Abu Dhabi Airports Authority
DEVELOPER
China State Construction, Eversendai Engineering, Beumer Group, PCE JV, ASP, TechTrade, CCM, Abanos, Pivot, JCDecaux Out of Home
CLIENT
Estidama-PBRS
SYSTEM
3 Pearl
CERTIFICATION
200
professionals trained
93
credits achieved
46
(%) water saved